CARBOROBOT Classic 80

The CARBOROBOT Classic 80 is in production more than 25 year. C80 can be perfectly employed for the heating of privat hauses, blocks of freehold flats, workshops, garden greenhouses, plant-houses, in every place, where a continuous, regulated, automatic heating without control is necessary. CARBOROBOT totally replaces oil and gas boilers with similar capacity. CARBOROBOT can be operated with a similar capacity as gas and oil heating, far cheaper than those because of the lower price of fuel.

They are produced in two version:
Classic 80 (C80) operate with coal default.
Classic 80 Bio (C80 Bio) can operate with biomass and fuel mixes too over the coal.

The nominal power is 80kW (68.000kcal/h) what measured with average fuel with 15BTU(17MJ/kg,4000kcal/kg). The ideal fuel piece size is 5-25mm. The dust content up to 20% possible. The ash content of different fuels can be up to 20%!!
For the installation need standard chimney. Sanitary hot water(SHW) also possible.

The installation has to be carried out following the relevant technical and local regulations. In closed heating systems a safety walve 2,5bar is necessary. To use buffer accumulator not necessary.

More information Private house heating

CARBOROBOT C80 main parts

1. Shell of the boiler
2. Ash chamber
3. Flue-gas fan
4. Outgoing heating water
5. Returning heating water
6. Observing hole
7. Boiler control and Movement control
8. Mover system
9. Firing hole
10. Rotary grate
11. Fuel container
12. Smoke outlet
13. Flue-ash cleaning hole
14. Cinder door
15. Water discharge screw
16. Stepping drive for grate
17. Fuel refilling door with rubber
18. Heat exchanger door
19. Secondary air tube
20. Cyclone cleaning hole
21. Controle hole
22. Grate adjusting bearings
23. Banding arc
24. Compass buffers
25. Draught adjusting flap
26. Multicyclone module
CARBOROBOT C80 end C80 Bio dimension



Recommend minimum distances:    a: 200mm      b: 600mm      c: 1200mm      d: 1200mm



Recommend minimum distances:    a: 800mm      b: 600mm      c: 1200mm      d: 1200mm

To see the boiler from the front side of Fuel container the handle is right or left. On handle side leave place to Ash door opening(c) and for the shovelling(not less 1,2m).
In front of the Fuel container(d) leave free distance min. 1,2m
Behind the boiler leave distance min. 60 cm for the tubes.
The Fuel door in opened position 30 cm higher than the Fuel container.
The left side of the boiler(the container wall) not to be nearer 80 cm to the wall.